From EU-OPS to Part-CAT: What Changed in EASA Operations Rules

Operational ProceduresCPL · ATPL11 min readUpdated Oct 2026
Definition

EU-OPS was the European Union's rulebook for commercial air transport by aeroplane, derived from the JAA's JAR-OPS 1. In 2014 it gave way to the Air Operations Regulation (EU) No 965/2012, whose Part-CAT and Part-ORO carry most of its content, restructured and since amended.

For years European airline crews flew under EU-OPS, the regulation that turned the JAA's JAR-OPS 1 into European Union law. Since 2014 the same ground has been covered by the Air Operations Regulation (EU) No 965/2012, usually called EU Air OPS, in which the conduct of commercial flights sits in Part-CAT and the operator's organisation in Part-ORO. Much of the content came across with little change, some of it moved out of the rule into acceptable means of compliance, and in 2021 two packages rewrote fuel planning and all-weather operations with effect from October 2022.

The history matters because training material ages more slowly than the law. Textbooks, operations manuals and question banks still quote EU-OPS paragraph numbers, the fuel policy and categories such as CAT IIIA. This article traces the line from JAR-OPS 1 to the current rules, maps the old references to the new ones, and lists the later changes that most often catch candidates out, including several outside Air OPS: runway condition reporting, the North Atlantic High Level Airspace and the 2025 amendment of the rules of the air. The legal structure itself is described in EASA regulatory framework.

JAR-OPS 1 and EU-OPS

The Joint Aviation Authorities (JAA) wrote common requirements for their member authorities, and JAR-OPS 1 was the code for commercial air transport by aeroplane. Like every JAR, it bound no one until a State wrote it into national law, and States could do so late or with differences. The European Union closed that gap by making the code binding as EU-OPS, an annex to an EU regulation, usually cited in the version of Commission Regulation (EC) No 859/2008. The JAA itself closed in 2009.

EU-OPS applied only to civil aeroplanes engaged in commercial air transport. Flights such as parachute dropping and fire-fighting, including positioning for them, were outside it, and it said nothing about non-commercial flying. Its paragraphs were numbered EU-OPS 1.001 onwards and grouped in lettered subparts, among them Subpart E for all-weather operations, Subpart J for mass and balance and Subpart Q for flight and duty time limitations. Detailed figures often sat in numbered appendices, such as Appendix 1 to EU-OPS 1.525(b), which held the take-off climb gradients of multi-engine Class B aeroplanes.

EU Air OPS and Part-CAT (2014)

Commission Regulation (EU) No 965/2012 of 5 October 2012 replaced EU-OPS in 2014. It splits the subject into annexes, each called a Part: definitions in Annex I, Part-ARO for the authorities, Part-ORO (Annex III) for operator organisations, Part-CAT (Annex IV) for commercial air transport and Part-SPA (Annex V) for specific approvals, plus Part-NCC, Part-NCO and Part-SPO for the non-commercial and specialised operations that EU-OPS never covered. Rule references name the Part, the subpart and the section: CAT.OP.MPA.181 is an operating procedure, CAT.POL.A.230 an aeroplane performance limitation, ORO.FTL.210 a flight time limitation.

Three changes of structure run through the conversion.

Some figures changed on the way. Flight crew duty records are now kept for 24 months (ORO.FTL.245) instead of 15. The operations manual no longer has to be in English unless approved otherwise; ORO.MLR.100 asks only that personnel understand the parts relevant to their duties. The list of critical phases of flight now includes the missed approach, which EU-OPS 1.192 left out.

Mapping EU-OPS to Part-CAT and Part-ORO

Most exam questions that cite EU-OPS have a current counterpart. The commonest are:

EU-OPS Subject Current rule
1.035 Quality system ORO.GEN.200, compliance monitoring
1.085 Duties in critical phases of flight CAT.GEN.MPA.105
1.110 Portable electronic devices CAT.GEN.MPA.140
1.115 Alcohol AMC to CAT.GEN.MPA.100
1.175 Nominated post holders ORO.AOC.135
1.255 Fuel policy CAT.OP.MPA.180 to 185 (since 2022)
1.295, 1.297 Selection of aerodromes, planning minima CAT.OP.MPA.182 (since 2022); isolated destinations CAT.OP.MPA.106
1.420 Occurrence reporting ORO.GEN.160
1.490 to 1.520 Class A take-off and landing CAT.POL.A.205 to 235
Subpart E All-weather operations CAT.OP.MPA.110 and SPA.LVO
Subpart J Mass and balance CAT.POL.MAB
1.1040 Operations manual ORO.MLR.100
1.1255 Flight crew compartment door ORO.SEC.100
Subpart Q Flight and duty time limitations ORO.FTL

Content can change while the subject stays put. The secured flight deck door of ORO.SEC.100 applies above 54,500 kg, above 45,500 kg with more than 19 passenger seats, or with more than 60 seats, where EU-OPS 1.1255 used 45,500 kg or 60 seats. Since 1 January 2019 every CVR on an EASA commercial aeroplane must record at least the last 2 hours, and aeroplanes above 27,000 kg first issued with a certificate of airworthiness on or after 1 January 2021 need 25 hours. Performance rules, by contrast, came across almost unchanged: the 60 per cent dry landing rule for turbojets and the 15 per cent wet increment of CAT.POL.A.230 and 235 are the EU-OPS figures.

The 2022 fuel/energy rules

Commission Implementing Regulation (EU) 2021/1296, applicable from 30 October 2022, replaced the fuel policy, which EU-OPS 1.255 had set out and Part-CAT had carried in CAT.OP.MPA.150 (now blank), with a fuel/energy scheme. CAT.OP.MPA.180 requires the scheme, which has three parts: fuel planning and in-flight re-planning (CAT.OP.MPA.181), aerodrome selection (CAT.OP.MPA.182) and in-flight fuel management (CAT.OP.MPA.185). The AMC, in ED Decision 2022/005/R, offer a basic fuel scheme, a basic fuel scheme with variations and an individual fuel scheme derived from the operator's own data with its authority's approval.

A Transavia Boeing 737-800 at a jet bridge, with a fuel vehicle parked beside it, hoses connected, and a worker in a high-visibility vest on a stand next to the engine.
A Transavia Boeing 737-800 being refuelled. Since 30 October 2022 a European commercial operator plans the fuel it loads under a fuel/energy scheme, which replaced the fuel policy inherited from EU-OPS.Hugo LUC · CC BY-SA 4.0 · Wikimedia Commons

The component names survived, and so did the final reserve quantities: 30 minutes at holding speed at 1,500 ft above aerodrome elevation in standard conditions for turbine-engined aeroplanes, and 45 minutes for piston-engined aeroplanes. Several details moved:

Non-commercial flying changed on the same date: NCO.OP.125 no longer states figures, which now sit in its AMC (see fuel planning and reserves and EU fuel schemes).

The 2022 all-weather operations rules

Commission Implementing Regulation (EU) 2021/2237, also applicable from 30 October 2022, rewrote the all-weather rules that Air OPS had largely carried over from EU-OPS Subpart E, and aligned their terms with ICAO. The changes most often examined are:

The detail is in EU all-weather operations rules.

Runway condition reporting: the Global Reporting Format

Runway surface reporting changed under ICAO's Global Reporting Format (GRF), applicable worldwide from 4 November 2021; EU rules applied it a little earlier, from 12 August 2021. The aerodrome now assesses each third of the runway and gives it a runway condition code (RWYCC) from 6, dry, to 0, braking action less than poor, using the Runway Condition Assessment Matrix. The result reaches crews in a runway condition report, through the ATIS and the SNOWTAM, which now describes contaminants in plain language and is valid for at most 8 hours instead of 24. Measured friction coefficients are no longer converted into braking action, and the runway state group has gone from the METAR.

A yellow truck fitted with a very wide yellow snow plough blade, parked on concrete in front of a hangar.
A snow plough of the kind used to clear runways. Under the ICAO Global Reporting Format the surface left behind is reported with a runway condition code for each third of the runway.Fabrice Ram · CC BY-SA 4.0 · Wikimedia Commons

The definitions moved with it. The damp runway, on which EU-OPS allowed dry performance, no longer exists: any visible dampness, or water up to 3 mm deep, makes the runway wet. The concession that treated a grooved or porous friction course runway as effectively dry has also gone. Part-CAT also requires a check in flight: under CAT.OP.MPA.303 the commander continues the approach only if the landing distance available is at least the landing distance at time of arrival, and the AMC expects a 15 per cent margin (see wet and contaminated runways).

NAT HLA and other airspace changes

On the North Atlantic, the minimum navigation performance specification airspace (MNPSA) became the NAT High Level Airspace (NAT HLA) on 4 February 2016. It extends from FL285 to FL420 inclusive, excludes the Shannon and Brest oceanic transition areas, SOTA and BOTA, and includes Bodø Oceanic, which MNPS airspace did not. ICAO NAT Doc 007 replaced the MNPS operations manual, the approval is still flagged by X in Item 10a of the flight plan, and the operator holds it as a specific approval in its operations specifications. Other NAT changes since then:

A chart of the North Atlantic showing six parallel organised tracks, lettered A to F, crossing the Gander and Shanwick oceanic areas, with a legend box marked HLA.
The North Atlantic organised tracks for one day in February 2017. The chart's legend gives the NAT High Level Airspace as FL285 to FL420, the airspace that replaced MNPS airspace in 2016. The Blue Spruce routes drawn near Greenland and Iceland were withdrawn in 2025.Coisabh · CC BY-SA 4.0 · Wikimedia Commons

In European airspace the Standardised European Rules of the Air (SERA), Regulation (EU) No 923/2012, were amended by Regulation (EU) 2024/404 from 1 May 2025. After a radio failure in IMC, an IFR flight now keeps its last assigned speed and level, or the minimum flight altitude if higher, for 20 minutes whether or not ATS surveillance is in use (SERA.14083), where the older rule gave 7 minutes in surveillance airspace; an IFR flight that continues in VMC to land at the nearest suitable aerodrome squawks 7601. ATS must now be told of a change in cruising speed of Mach 0.02 or 10 kt TAS (formerly 5 per cent of the TAS); a revised estimate is due when an estimate is more than 2 minutes in error, where older texts give 3 minutes. On the ground, the ACR/PCR method replaced ACN/PCN for reporting pavement strength on 28 November 2024. See also oceanic and North Atlantic operations and radio communication failure.

Reading older texts and exam questions

Question banks keep EU-OPS figures because examiners still ask for them, normally with a label: "under EU-OPS", "before October 2022", "under the former rules". When a question carries such a label, answer with the old rule; when it names Part-CAT, a current rule reference or nothing at all, use the current one.

Topic EU-OPS and older texts Current rule
Low visibility take-off RVR below 400 m RVR below 550 m; approval below 400 m
CAT III IIIA, IIIB and IIIC One category; 175 m for DH 50 to 99 ft
Approaches with credits LTS CAT I, OTS CAT II SA CAT I, SA CAT II
Fuel Fuel policy, 3% ERA Fuel/energy scheme, fuel ERA
Isolated destination 2-hour fuel criterion Prior approval (CAT.OP.MPA.106)
Damp runway Own category Reported as wet
SNOWTAM Valid 24 hours Valid 8 hours
Oceanic airspace MNPS airspace NAT HLA
Duty records 15 months 24 months

Exam tip: a figure can be right for one rule set and wrong for the other. "400 m" is the LVTO definition under EU-OPS but the SPA.LVO approval threshold today; "200 m" was the CAT IIIA RVR, while the current single CAT III uses 175 m for a DH of 50 ft or more. Read the date or rule set in the question before the options.

Two areas still lean on the older material. The flight time limitation scheme of ORO.FTL and CS FTL.1 covers scheduled and charter operations by aeroplane, while air taxi, emergency medical and single-pilot operations remain under EU-OPS Subpart Q and national rules for now (see flight time limitations). And the mass and balance rules of CAT.POL.MAB are so close to EU-OPS Subpart J that many textbooks still teach them under the old name.

Frequently asked questions

What replaced EU-OPS?

EU-OPS was replaced in 2014 by the Air Operations Regulation, Commission Regulation (EU) No 965/2012. Its operating rules for commercial air transport moved into Part-CAT, and its organisational rules, such as the operations manual, nominated persons, crew training and flight time limitations, into Part-ORO. Detailed figures that EU-OPS wrote into the rule often moved into acceptable means of compliance. The fuel and all-weather rules were then rewritten again with effect from 30 October 2022.

What is the difference between Part-CAT and Part-ORO?

Both are annexes to the Air Operations Regulation. Part-ORO, Annex III, sets the organisation requirements for operators, including the air operator certificate, the management system, crew training and checking, flight time limitations and the operations manual. Part-CAT, Annex IV, sets how commercial air transport flights are conducted, including fuel planning, aerodrome operating minima, performance, mass and balance, and instruments and equipment.

What changed in the EASA fuel rules in 2022?

Regulation (EU) 2021/1296, applicable from 30 October 2022, replaced the fuel policy inherited from EU-OPS with a fuel/energy scheme in CAT.OP.MPA.180 to 185. The scheme has a planning and in-flight re-planning policy, an aerodrome selection policy and an in-flight fuel management policy, with basic, basic with variations and individual levels. The 3% ERA became the fuel ERA, and isolated destinations now need the authority's prior approval.

Are EU-OPS figures still examined?

Yes. Many question banks still ask for EU-OPS values, normally labelled as EU-OPS or as the rules before October 2022. Typical examples are a low visibility take-off below 400 m RVR, CAT IIIA and IIIB minima, alternate planning minima of MDH plus 200 ft and 1,000 m, the damp runway and the 24-hour SNOWTAM. Answer with the rule set the question names, and with the current rule when it names Part-CAT or none.

When did MNPS airspace become the NAT HLA?

The North Atlantic minimum navigation performance specification airspace became the North Atlantic High Level Airspace on 4 February 2016. The NAT HLA extends from FL285 to FL420 inclusive. Unlike MNPS airspace it excludes the Shannon and Brest oceanic transition areas and includes Bodø Oceanic. The approval is still shown by the letter X in Item 10a of the flight plan, and NAT Doc 007 replaced the old MNPS operations manual.

Test yourself on From EU-OPS to Part-CAT: What Changed in EASA Operations Rules

The v1prep banks cover this topic in Operational Procedures (070), with a worked explanation for every answer. EASA ATPL, PPL, IR and CPL, the FAA written tests and type ratings for the A320, 737, A220, 787, ATR 72 and E-Jet.

Start practising →
15,000+ questions · EASA & FAA · Free to start

Library articles are written for study and exam preparation. They do not replace your aircraft's approved documentation, your operator's procedures or the regulations themselves.