EU Fuel Schemes: Basic, Variations and Individual

Flight PlanningCPL · ATPL10 min readUpdated Oct 2026
Definition

A fuel/energy scheme is the set of policies that an EU commercial air transport operator of airplanes must establish under CAT.OP.MPA.180 to plan, re-plan and manage the fuel or energy of its flights. It is applied at one of three levels: the basic scheme, the basic scheme with variations or an individual scheme.

The fuel/energy scheme is the framework within which a European commercial operator decides how much fuel each flight carries and how that fuel is managed once the flight is under way. It replaced the fuel policy inherited from EU-OPS on 30 October 2022, when Commission Implementing Regulation (EU) 2021/1296 rewrote the fuel rules of the Air Operations Regulation. The names of the fuel components survived, and so did most basic figures. What changed is the structure around them.

The scheme can be applied at three levels: a basic fuel scheme with fixed figures close to the traditional ones, a basic fuel scheme with variations for operators approved to use specific reductions, and an individual fuel scheme for operators able to derive their own figures from data. This article describes that structure for airplanes in commercial air transport. The fuel components themselves are covered in fuel planning and fuel reserves, and private flights in fuel and energy planning for general aviation.

The 2022 fuel/energy rules

Regulation (EU) 2021/1296 amended the Air Operations Regulation, (EU) No 965/2012, with effect from 30 October 2022. For commercial air transport by airplane, CAT.OP.MPA.180 requires the operator to establish a fuel/energy scheme made up of three policies. The word energy anticipates electric and hybrid aircraft, whose energy has to be planned in the same way as fuel.

Rule Content
CAT.OP.MPA.180 The fuel/energy scheme
CAT.OP.MPA.181 Fuel/energy planning and in-flight re-planning policy
CAT.OP.MPA.182 Aerodrome selection policy
CAT.OP.MPA.185 In-flight fuel/energy management policy
CAT.OP.MPA.106 Use of isolated aerodromes

The final reserve is written into CAT.OP.MPA.181 itself, but many other figures, such as the contingency percentages and the planning minima for alternates, sit in the acceptable means of compliance (AMC) and guidance material of ED Decision 2022/005/R. The old fuel policy rule, CAT.OP.MPA.150, is now blank. The selection of alternates, formerly EU-OPS 1.295 and 1.297, became part of the scheme as CAT.OP.MPA.182; older texts cite CAT.OP.MPA.185 for planning minima, a number that now covers in-flight fuel management. The rules for non-commercial operations (Part-NCC and Part-NCO) and specialized operations (Part-SPO) were restructured on the same date; in Part-NCO the reserve figures moved out of NCO.OP.125 into its AMC.

Planning and in-flight re-planning policy

The planning policy of CAT.OP.MPA.181 fixes what the pre-flight calculation of usable fuel contains. Taxi fuel is the fuel expected to be used before takeoff. Trip fuel takes the airplane from takeoff to landing at the destination along the most likely routing, with realistic fuel flows, masses and weather. Reserve fuel groups contingency, destination alternate, final reserve and, where required, additional fuel. Above the minimum come extra fuel, planned for anticipated delays or specific operational constraints, and discretionary fuel, added at the commander's discretion. EU-OPS had a single extra fuel for both.

Contingency fuel absorbs deviations from the plan: stronger winds, a different routing or level, or an airframe that burns more than the book figure. It is calculated on trip fuel only, never on alternate fuel. Final reserve fuel is fuel to fly for 30 minutes for turbine-engined airplanes, or 45 minutes for piston-engined airplanes, at holding speed at 1,500 ft (450 m) above aerodrome elevation in standard conditions, calculated at the estimated mass on arrival at the destination alternate, or at the destination when no alternate is required.

In-flight re-planning applies the same build-up from a point en route; contingency is then taken on the trip fuel remaining from that point. The other two policies complete the scheme. The aerodrome selection policy (CAT.OP.MPA.182) decides which alternates a flight needs and the weather they must be forecast to have (see alternate aerodromes). The in-flight fuel management policy (CAT.OP.MPA.185) requires fuel checks at regular intervals and sets when crews declare MINIMUM FUEL and MAYDAY FUEL (see in-flight fuel management).

The basic fuel scheme

The basic fuel scheme uses fixed figures that stay close to those of EU-OPS:

On short sectors the 5-minute floor often decides. A light twin with a planned trip fuel of 40 kg and a holding fuel flow of 60 kg/h needs 5 kg of contingency fuel, not the 2 kg that 5 percent would give.

Exam tip: questions written before 2022 speak of a "fuel policy" and a "3% ERA"; the current terms are "fuel/energy scheme" and "fuel ERA". The basic contingency and final reserve quantities are the same in both; the rules differ for planning minima, isolated destinations and the takeoff alternate of three- and four-engined airplanes.

Variations: reduced contingency and destination alternate options

The basic fuel scheme with variations keeps the structure of the basic scheme but replaces some fixed figures with reductions that the competent authority has approved for the operator. Typical examples are:

Approach available at the alternate Basic scheme (AMC6) With variations (AMC8)
Type B (CAT I, II or III) DA/H + 200 ft, RVR/VIS + 800 m DA/H + 200 ft, + 550 m
3D type A, facility with a system minimum of 200 ft or less DA/H + 400 ft, + 1,500 m DA/H + 200 ft, + 800 m
Two or more type A, each on a separate navigation aid DA/H or MDA/H + 400 ft, + 1,500 m DA/H or MDA/H + 200 ft, + 1,000 m
Any other type A DA/H or MDA/H + 400 ft, + 1,500 m DA/H or MDA/H + 400 ft, + 1,500 m
Circling MDA/H + 400 ft, + 1,500 m MDA/H + 400 ft, + 1,500 m

An alternate served only by one non-precision approach with an MDH of 350 ft and a minimum visibility of 1,500 m must be forecast to have at least 750 ft and 3,000 m under the basic scheme. With variations, if a second type A approach on a separate navigation aid were also usable, the table would give 550 ft and 2,500 m.

A fuel truck under an airliner's wing, a hose rising to the wing and another running across the apron to a ground point marked by a cone and flag.
An airliner being fueled at Vienna Airport. Since 30 October 2022 the quantity an EU operator loads is planned under its fuel/energy scheme: the basic figures, the variations its authority has approved, or figures derived from its own data.Kenzel2 · CC BY-SA 4.0 · Wikimedia Commons

Individual fuel schemes and safety performance monitoring

An individual fuel scheme goes furthest. Instead of taking the AMC figures, with or without approved variations, the operator derives its own fuel quantities from data on its routes and fleet, and the scheme needs the competent authority's approval. It is meant for operators with a mature management system, because the figures are only as good as the data behind them and the organization's ability to notice when they stop being adequate.

One source of that data is a fuel consumption monitoring program, which records the actual burn of each aircraft against the planning figures over many flights. Analyzed statistically, such data show how much contingency fuel is really used on a route. They also reveal individual airframes whose performance has deteriorated and which burn more than the fleet figures assume.

The data then feed the management system that ORO.GEN.200 requires of the operator. In safety management terms, a new or reduced fuel figure is a change, whose hazards are identified and risks assessed before it is introduced. Once it is in use, safety performance monitoring tracks indicators against targets using operational data. For fuel, possible indicators are how often flights land with less fuel than planned, how often crews declare MINIMUM FUEL and how often a diversion is forced by fuel (see safety management systems).

Fuel ERA aerodromes

A fuel ERA aerodrome, or fuel en-route alternate, is an en-route alternate selected so that contingency fuel can be reduced to 3 percent of trip fuel. Under EU-OPS it was called the 3% ERA. Late in the flight it offers somewhere to land if consumption has run above plan, which is why less contingency need be carried all the way to the destination. It must lie within a defined area along the later part of the route, and its weather must be forecast at or above the same planning minima that apply to a destination alternate.

A fuel ERA is not the same as the other en-route alternates in the rules. A performance class A twin without an extended range approval must stay within 60 or 120 minutes' one-engine-inoperative flight of an adequate aerodrome, depending on its seats and mass (CAT.OP.MPA.140). ETOPS flights name en-route alternates within their approved diversion time, planned with increments of 200 ft and 800 m for a precision approach and 400 ft and 1,500 m for a non-precision or circling approach (see ETOPS). Those alternates protect against a failure; the fuel ERA protects the fuel calculation.

Isolated aerodromes

An isolated aerodrome is a destination for which no destination alternate is available within a reasonable diversion. Under Part-CAT an airplane may use one as a destination only with the competent authority's prior approval (CAT.OP.MPA.106). The flight carries no alternate fuel; additional fuel takes its place, and the destination itself must be forecast at or above the planning minima normally applied to alternates.

Many exam questions quote the EU-OPS figures. Under EU-OPS a turbine airplane's destination counted as isolated when the fuel to divert to the nearest adequate alternate plus final reserve exceeded 2 hours at normal cruise consumption above the destination, and the planning figure mirrored that test: enough additional fuel for additional plus final reserve fuel to last 2 hours at normal cruise consumption above the destination. For piston airplanes EU-OPS used 45 minutes plus 15 percent of the planned cruise time, or 2 hours, whichever was less.

A moai statue beside the apron at Mataveri airport on Easter Island, with a LAN airliner parked behind a hedge and palm.
Mataveri airport on Easter Island, a textbook example of an isolated aerodrome. With no destination alternate within reach, a flight there carries additional fuel in place of alternate fuel and is planned around a point beyond which it is committed.Jialiang Gao www.peace-on-earth.org · CC BY-SA 3.0 · Wikimedia Commons

Such flights are planned around a point of safe return, the last point from which the airplane can return to its departure aerodrome, or reach an en-route alternate, with the required reserves; EU-OPS built its procedure around a similar predetermined point. Before passing it, the crew confirm the destination weather and the fuel remaining, because beyond it they are committed (see point of equal time and point of no return). Part-NCO, by contrast, has had no isolated aerodrome provision since 30 October 2022.

What changed from EU-OPS

Many exam questions still carry EU-OPS wording. The main differences are:

Item EU-OPS and Part-CAT before 30 October 2022 Since 30 October 2022
Framework Fuel policy (EU-OPS 1.255, then CAT.OP.MPA.150) Fuel/energy scheme, CAT.OP.MPA.180 to 185
Levels A single policy with optional approved reductions Basic, basic with variations, individual
Alternate for reduced contingency 3% ERA Fuel ERA
Fuel above the minimum Extra fuel, at the commander's discretion Extra fuel (planned) and discretionary fuel
Piston final reserve 45 minutes, holding basis stated for turbines only 45 minutes at holding speed at 1,500 ft, as for turbines
Alternate selection EU-OPS 1.295 and 1.297 CAT.OP.MPA.182, part of the scheme
Planning minima, single non-precision approach MDH + 200 ft, + 1,000 m MDA/H + 400 ft, + 1,500 m (basic scheme)
Isolated destination 2-hour fuel test Prior approval (CAT.OP.MPA.106)
Takeoff alternate, three or four engines 2 hours at one-engine-inoperative cruise speed 2 hours at all-engines-operating cruise speed

When a question names EU-OPS or the rules before October 2022, answer with the old figures; when it names Part-CAT, a current rule or nothing at all, use the current ones (see from EU-OPS to Part-CAT).

FAA rules for airlines state their reserves in Part 121 itself. A domestic flight needs fuel to the destination, then to the most distant alternate, then for 45 minutes at normal cruising fuel consumption (14 CFR 121.639). A turbojet on flag or supplemental operations outside the 48 contiguous states adds fuel for 10 percent of the flight time to the destination, then to the most distant alternate, then for 30 minutes of holding at 1,500 ft above the alternate (121.645).

Frequently asked questions

What is the EASA fuel/energy scheme?

Since 30 October 2022, Regulation (EU) 2021/1296 has required every EU commercial air transport operator of airplanes to establish a fuel/energy scheme under CAT.OP.MPA.180. It has three policies, for fuel/energy planning and in-flight re-planning (CAT.OP.MPA.181), aerodrome selection (CAT.OP.MPA.182) and in-flight fuel/energy management (CAT.OP.MPA.185). It replaced the fuel policy that EU-OPS 1.255 had set out and Part-CAT carried in CAT.OP.MPA.150, and the word energy allows for electric and hybrid aircraft.

What is the difference between the basic fuel scheme and the basic fuel scheme with variations?

The basic fuel scheme uses the fixed figures of the acceptable means of compliance, such as contingency fuel of 5 percent of trip fuel or 5 minutes of holding at 1,500 ft above the destination, whichever is higher, and the standard planning minima for alternates. The basic scheme with variations adds reductions approved by the competent authority, such as a 3 percent contingency with a fuel ERA, a statistically derived contingency or planning minima that give credit for better approaches.

What is a fuel ERA aerodrome?

A fuel ERA is an en-route alternate selected so that contingency fuel can be reduced from 5 to 3 percent of trip fuel. Before 30 October 2022 it was called a 3% ERA, the name many exam questions still use. Its weather must be forecast at or above the same planning minima as a destination alternate, and it must lie within a defined area along the later part of the route. It is not the same as an ETOPS en-route alternate.

What is an individual fuel scheme?

An individual fuel scheme is the most advanced level of the EASA fuel/energy scheme. Instead of taking fixed figures from the acceptable means of compliance, the operator derives its own fuel quantities from data on its routes and fleet, for example from its fuel consumption monitoring, and needs the competent authority's approval. It is meant for operators with a mature management system, able to judge from their own data whether the figures still give enough fuel.

Can an isolated aerodrome be used as a destination under EASA rules?

Yes, but for commercial air transport by airplane only with the competent authority's prior approval under CAT.OP.MPA.106. An isolated aerodrome is a destination with no destination alternate within reach. The EU-OPS test, still common in exam questions, treated a turbine airplane's destination as isolated when diversion fuel plus final reserve exceeded 2 hours at normal cruise consumption. Since October 2022 Part-NCO has had no isolated aerodrome provision at all.

Did the final reserve fuel change in 2022?

The quantities did not change, 30 minutes for turbine-engined airplanes and 45 minutes for piston-engined airplanes, but the wording did. CAT.OP.MPA.181 now applies one basis to both, holding speed at 1,500 ft above aerodrome elevation in standard conditions, calculated at the estimated mass on arrival at the destination alternate, or at the destination when no alternate is required. Older texts stated the holding basis for turbine airplanes only.

Test yourself on EU Fuel Schemes: Basic, Variations and Individual

The v1prep banks cover this topic in Flight Planning (033), with a worked explanation for every answer. EASA ATPL, PPL, IR and CPL, the FAA written tests and type ratings for the A320, 737, A220, 787, ATR 72 and E-Jet.

Start practicing →
15,000+ questions · EASA & FAA · Free to start

Library articles are written for study and exam preparation. They do not replace your aircraft's approved documentation, your operator's procedures or the regulations themselves.