A320 Emergency Electrical Configuration
The A320 emergency electrical configuration is the state of the aircraft after AC BUS 1 and AC BUS 2 have both lost their supply: the ram air turbine drives an emergency generator through the blue hydraulic system, the batteries and static inverter bridge the gaps, and only the essential buses remain powered.
The A320's emergency electrical configuration (EMER ELEC, shown on the ECAM as ELEC EMER CONFIG) is what is left when AC BUS 1 and AC BUS 2 have both lost their supply. Above 100 kt the ram air turbine (RAT) extends into the airflow and pressurizes the blue hydraulic system, which drives a small emergency generator. Until it couples, and whenever it cannot run, the two batteries and a static inverter carry the load. Only the essential buses stay powered, so the crew fly with the captain's instruments and one VHF radio, and without the protections of normal law.
Each of the three generators can supply all the bus bars on its own, so all three must be unavailable at once, but it does happen: Airbus and the NTSB have both reported cases. The network itself is described in A320 electrical system; this article follows what happens when it fails and how crews get out of it.
Loss of main AC generation
The generators are never connected in parallel. Engine generators 1 and 2 each feed their own AC bus, and bus tie contactors let the APU generator, external power or the other engine generator take over a bus that has lost its source. Both main AC buses go dead only when no source remains for either:
- Both integrated drive generators (IDGs) fail. Worn components inside the IDGs' constant speed drives can upset frequency regulation, and Airbus has had reports of both IDGs failing in sequence for that reason (see the reported events below). In the Spirit Airlines event investigated by the NTSB, generator 2 tripped at normal load and generator 1 after its load had doubled.
- Both engines fail. The NTSB notes that an IDG supplies power only above about 54 % N2, so the generators drop off as the engines run down. Without the APU generator, the aircraft goes into the emergency configuration; the ENG DUAL FAILURE warning comes with both GEN FAULT lights.
- The electrical smoke procedure sheds the main busbars deliberately. Its distribution is that of the emergency configuration, except that the fuel pumps are connected upstream of the GEN 1 line contactor, so that GEN 1 keeps feeding them.
- On the ground, the same Spirit Airlines A319 lost electrical power three times in January 2020 during single-engine taxi after landing, with one IDG carrying the whole electrical load (NTSB).
RAT extension and the emergency generator
With the MAN ON pushbutton at AUTO, the RAT extends automatically when AC BUS 1 and AC BUS 2 are both lost and the speed is above 100 kt. The crew can extend it at any time with the guarded MAN ON pushbutton on the EMER ELEC PWR panel; a RAT MAN ON pushbutton on the hydraulic panel also extends it to pressurize the blue system. The RAT is a drop-out turbine, stowed in the left belly fairing, coupled to a hydraulic pump on the blue system, which then works at 2,500 psi instead of the normal 3,000 psi. Once extended, it can be stowed only on the ground.

The blue system drives the constant speed motor/generator (CSM/G), the emergency generator, through a hydraulic motor. It delivers 5 kVA of three-phase 115/200 V, 400 Hz power. Its own generator control unit controls the start-up, keeps it at constant speed, regulates its voltage and protects the network through its line contactor; it is never synchronized with another source. After an automatic extension the generator couples about 8 seconds after the loss of the main buses; after a manual extension it couples 3 seconds after the RAT starts supplying it.
The indications follow the sequence:
- the red RAT & EMER GEN FAULT light on the EMER ELEC PWR panel comes on whenever the emergency generator is not supplying power while AC BUS 1 and 2 are unpowered;
- the ECAM shows the green EMER GEN memo once the generator runs, and the green RAT OUT memo while the RAT is not stowed;
- on the ELEC page AC BUS 1 and 2 are amber, and the emergency generator's voltage and frequency turn amber outside 110 to 120 V and 390 to 410 Hz; they are not shown while its line contactor is open;
- on the HYD page RAT appears in green when the RAT is out, and with an amber arrow if its pump is not available.
The guarded EMER GEN TEST pushbutton, held with the normal AC buses supplied, drives the emergency generator from the blue electric pump and connects the AC ESS and DC ESS buses, but not the shed buses, to it; on the ground the ELEC page appears automatically. Held with only the batteries supplying the aircraft, it lets the static inverter power the AC ESS bus.

Buses still powered
| Bus | Normal flight | Batteries only | EMER GEN running |
|---|---|---|---|
| AC BUS 1, AC BUS 2 | GEN 1, GEN 2 | Lost | Lost |
| AC ESS | AC BUS 1 | Static inverter (from BAT 1), above 50 kt | EMER GEN |
| AC SHED ESS | GEN 1, through AC ESS | Shed | EMER GEN |
| DC BUS 1, DC BUS 2 | TR 1, TR 2 | Lost | Lost |
| DC ESS | TR 1, through DC BAT BUS | BAT 2 | ESS TR, from EMER GEN |
| DC SHED ESS | TR 1 | Shed | ESS TR, from EMER GEN |
| DC BAT BUS | TR 1 | Not supplied in flight | Not supplied in flight |
| HOT BUS 1, HOT BUS 2 | Batteries | Batteries | Batteries |
With the emergency generator running, the AC ESS FEED pushbutton no longer matters, and the essential transformer rectifier (ESS TR), unused in normal flight, turns the generator's output into DC for the DC ESS and DC SHED ESS buses. The essential loads, among them the captain's PFD and ND, key avionics and key lighting, sit on these buses; galleys, the DC entertainment bus and most cabin lighting are shed.
Batteries-only configuration
The batteries carry the emergency network on their own in four cases: during the roughly 8 seconds before the emergency generator couples, if the RAT stalls, if the emergency generator fails, and on the ground below 100 kt, when the RAT no longer drives it. Then:
- BAT 1 drives the static inverter, which turns its DC into 1 kVA of single-phase 115 V, 400 Hz AC for part of the AC ESS bus. Above 50 kt it runs automatically, whatever the BAT pushbutton positions; below 50 kt only if both BAT pushbuttons are on.
- BAT 2 supplies the DC ESS bus.
- The AC SHED ESS and DC SHED ESS buses are shed to save the batteries, and SHED appears against them on the ELEC page.
The AC ESS FEED FAULT light stays out while the static inverter feeds the AC ESS bus, because that bus is still supplied; if the static inverter itself has failed, the AC ESS bus is lost. Some loads switch over by themselves: once the static inverter is operating, igniter A of each engine moves to the static inverter bus, and the APU fuel pump runs from that bus if the AC SHED ESS bus has failed. On the flight deck only the right-hand dome light remains.
Each battery has a normal capacity of 23 Ah. The time they can carry the emergency network is given in the FCOM for the aircraft concerned.
Note: on the ground, the emergency network falls back to the batteries below 100 kt. The DC BAT BUS is then connected to the batteries and an APU start becomes possible. Below 50 kt the AC ESS bus is shed, the static inverter feeds only the AC static inverter bus, and all the display units go blank.
Worked example: both generators lost in descent at 250 kt
- GEN 2 fails, the APU is not running, and GEN 1 takes over both AC buses. Shortly afterward GEN 1 fails too: AC BUS 1 and 2 are lost.
- The batteries take the essential network at once: BAT 1 through the static inverter for the AC ESS bus, BAT 2 for the DC ESS bus. The shed buses go dark.
- Being above 100 kt, the RAT extends and blue pressure builds to 2,500 psi.
- About 8 seconds after the loss, the emergency generator couples and takes the AC ESS and AC SHED ESS buses, and through the ESS TR the DC ESS and DC SHED ESS buses; the EMER GEN memo appears.
- If the RAT were to stall, the network would fall back to step 2 and the shed buses would be lost again.
Effects on systems and flight controls
| System | In the emergency configuration |
|---|---|
| Flight controls | Normal law is not kept (see below); the blue system, at 2,500 psi, still powers part of the flight control actuators |
| Engine control | FADEC channel A of both engines is supplied from the DC ESS bus |
| Communications | Only RMP 1 and VHF 1 work, which is why the SOP assigns VHF 1 to ATC |
| Displays and ECAM | Captain's PFD and ND; secondary failures are inhibited on the ECAM |
| Probe heating | Captain's probes stay heated; with AIR DATA at CAPT 3, the standby pitot heat moves to the AC ESS bus and the captain's pitot heat is lost |
| Bleed air | BMC 1 remains, on DC ESS; engine 1's bleed valves are on DC ESS SHED, engine 2's bleed, HP and fan air valves are lost; the crossbleed valve works only manually |
| Doors | Cargo door control is lost; the doors and slides control keeps a standby supply from HOT BUS 2 |
| Emergency lighting | With EMER EXIT LT at ARM, the overhead emergency lights come on, as AC BUS 1 has failed |
Without a main generator the flight controls leave normal law. The NTSB found that, had the captain of US Airways Flight 1549 not started the APU, the airplane would not have remained in normal law with its flight envelope protections. In the reconfiguration laws the protections are reduced or lost, and alpha floor is inoperative in both alternate and direct law (see A320 flight control laws and protections). The green and yellow hydraulic systems keep their engine-driven pumps as long as the engines run.
ECAM procedure and recovery
The ECAM alert is ELEC EMER CONFIG, and while it is active secondary failures are inhibited on the ECAM. Getting out of the configuration means getting a main source back; the FCOM procedure gives the exact sequence, and the means are these:
- Reset the generators. Selecting a GEN pushbutton OFF opens the generator line contactor and resets the fault circuit; back at ON, the line contactor closes if the generator's parameters are normal. After a differential fault, a reset has no effect after two attempts. Airbus's Safety First article also gives crews recommendations for avoiding the emergency configuration after a single generator failure.
- Start the APU. It can be started from the batteries or from the normal network, and starting it is permitted throughout the normal flight envelope; the US Airways Engine Dual Failure checklist quoted by the NTSB placed the APU start after the relight attempts, below FL 250. During the start the batteries are connected to the DC BAT BUS while the MASTER SW is on and APU speed is below 95 %; with the emergency generator running, that connection is limited to 3 minutes. Once on line, the APU generator can replace both engine generators.
- Reset FAC 1. In the US Airways Engine Dual Failure checklist quoted by the NTSB, turning FAC 1 off then on recovers the characteristic speeds on the PFD and permits recovery of the rudder trim even if no indication is available.
The same checklist told the crew to turn on emergency electrical power, that is, to extend the RAT manually with MAN ON, if the emergency generator was not on line.
Exam tip: RAT automatic above 100 kt with both AC buses lost; EMER GEN couples about 8 s later (3 s after a manual extension); static inverter 1 kVA from BAT 1, automatic above 50 kt; DC BAT BUS reconnects and APU start possible below 100 kt on the ground; AC ESS shed below 50 kt.
The FAA's Flight Standardization Board report makes "total loss of electrical power, emergency electrical configuration" a flight maneuver for pilots converting from the A330 or the A340: it is trained at Level D, in a device that flies it in real time, and needs no separate check (Level A). This article follows the A320 FCOM as quoted in the v1prep question banks, which draw no ceo/neo distinction here; the A321neo XLR, which has no FACs, reconfigures its flight controls differently.
Reported events
Worn IDGs (Airbus, 2025). Airbus's Safety First article on preventing the loss of engine generators, as summarized on its web page, reports cases of emergency electrical configuration on A320 aircraft in which both IDGs failed in sequence because of worn components inside their constant speed drives. The article describes one of these events, explains why worn IDGs may have frequency regulation problems in certain circumstances, presents the preventive maintenance tasks introduced to detect worn IDGs in advance, and gives flight crews recommendations for preventing the emergency configuration after a single generator failure.
Spirit Airlines A319, Sacramento (NTSB, 2020). On 15 February 2020, Spirit Airlines Flight 1818, an Airbus A319-132 registered N521NK, was descending from 4,000 to 2,000 ft on approach to Sacramento when the crew saw ELEC GEN 2 FAULT and, about 11 seconds later, ELEC GEN 1 FAULT. AC BUS 1 and AC BUS 2 lost power, several flight deck displays and systems went with them, and the RAT extended automatically and drove the emergency generator. The crew declared an emergency and landed without further incident; none of the 117 occupants was injured. The aircraft had lost both generators on approach to Atlanta the day before. The NTSB found that a fixed cylinder block in each IDG had significant wear of its reworked brass liners, which made the IDGs' output frequency go outside its design limit.
Hudson River ditching (NTSB, 2009). On 15 January 2009 both engines of US Airways Flight 1549, an A320, lost thrust after the airplane struck a flock of birds, and the captain started the APU at once, an item the crew never reached in the checklist. The NTSB concluded that this ensured a primary source of electrical power and kept the airplane in normal law, with its flight envelope protections, before the ditching on the Hudson River; the RAT was found extended after the aircraft was recovered from the water (see forced landing and ditching).
Frequently asked questions
When does the A320 go into the emergency electrical configuration?
When AC BUS 1 and AC BUS 2 are both unpowered, which needs the loss of both engine generators with no APU generator or external power to replace them. Causes include a sequential failure of both IDGs and a dual engine failure without the APU generator; the electrical smoke procedure deliberately sets up an almost identical distribution. Above 100 kt the RAT then extends automatically and the emergency generator couples about 8 seconds later.
What stays powered in the A320 emergency electrical configuration?
With the emergency generator running, the AC ESS and AC SHED ESS buses, and through the ESS TR the DC ESS and DC SHED ESS buses, plus the hot battery buses. That keeps the captain's PFD and ND, key avionics and lighting, VHF 1 controlled from RMP 1, and the captain's probe heating. AC BUS 1 and 2, DC BUS 1 and 2 and, in flight, the DC BAT BUS are lost, along with galleys and most cabin lighting.
What happens on the A320 when only the batteries supply the aircraft?
Battery 1 drives the static inverter, which supplies part of the AC ESS bus with 1 kVA of single-phase AC, automatically above 50 kt, and battery 2 supplies the DC ESS bus. The AC SHED ESS and DC SHED ESS buses are shed. This happens before the emergency generator couples, if the RAT stalls or the generator fails, and on the ground below 100 kt. Below 50 kt on the ground the AC ESS bus is shed and all display units go blank.
Does the A320 keep normal law in the emergency electrical configuration?
Not according to the NTSB's analysis of the Hudson River ditching. When US Airways Flight 1549 lost both engines, the captain started the APU at once. The NTSB concluded that this ensured a primary source of electrical power and kept the airplane in normal law with its flight envelope protections, and that without it the airplane would not have remained in normal law. Outside normal law the protections are reduced or lost, and alpha floor is inoperative.
Can the RAT be retracted in flight on the A320?
No. Once extended, automatically or with the MAN ON pushbutton, the ram air turbine can be stowed only with the aircraft on the ground. The green RAT OUT memo shows that it is not fully stowed, and it turns amber in flight phases 1 and 2, before takeoff power is set. Restoring a generator or the APU in flight returns power to the main buses, but the RAT stays out until landing.
Test yourself on A320 Emergency Electrical Configuration
The v1prep banks cover this topic in the A320 type-rating bank, with a worked explanation for every answer. EASA ATPL, PPL, IR and CPL, the FAA written tests and type ratings for the A320, 737, A220, 787, ATR 72 and E-Jet.
Start practicing →Sources and further reading
- Airbus Safety First, Preventing Loss of Engine Generators on A320 Family, A330 and A340 Aircraft (March 2025)
- NTSB Aircraft Accident Report AAR-10/03, Loss of Thrust in Both Engines After Encountering a Flock of Birds and Subsequent Ditching on the Hudson River, US Airways Flight 1549, Airbus A320-214, N106US
- NTSB final report ENG20LA016, Spirit Airlines Airbus A319 N521NK, loss of both AC networks on approach to Sacramento, 15 February 2020
- FAA Flight Standardization Board Report, Airbus A320, Revision 7 (draft)
- EASA Easy Access Rules for Large Aeroplanes (CS-25), CS 25.1351 to 25.1365, electrical systems and equipment
Library articles are written for study and exam preparation. They do not replace your aircraft's approved documentation, your operator's procedures or the regulations themselves.